Converse County Wind
532 MEGAWATTS
Bringing Wind Energy To Wyoming.
This 532-megawatt wind energy farm was constructed in Converse County near Douglas, Wyoming. It consists of 75.8 miles roads and included the installation of 200 turbines, which were divided into three phases. Cedar Springs came online in late 2020 and includes two operations and maintenance buildings.
Project facts.
200
Turbines
How Many Turbines Installed?
75.8
MILES
How Many Miles Of Roads Were Installed?
499
FEET
HOW TALL IS EACH TOWER?