Taylor & Nolan Counties Repower
770 MEGAWATTS

Repowering Texas With Sustainability.

The project consisted of 291 existing turbines that were originally installed by Blattner Energy in 2005. The repower scope included the mechanical overhaul of the existing turbines including blades, hub, gear boxes, main shafts, main bearing assemblies, generator and generator frame. 

Talk to an Expert
BE

Achievements: Continuous Improvement.

  • Collaboration to develop improved means and methods for added value
  • Delivering power within a functioning/energized wind farm